Advice · 7 min read
Common Heating Pipework Mistakes on Commercial Sites
The heating pipework problems we get called in to fix are usually the same handful of mistakes. Here's what they are and how to avoid them on your project.
A fair share of our work across the Black Country and Birmingham is putting right heating pipework that should have been installed properly the first time. The mistakes are rarely exotic — they're the same issues, repeated on site after site, usually because the installation was rushed, under-planned or treated as an afterthought to the rest of the fit-out.
1. No thought for isolation
Heating systems need to be maintained, and maintenance means draining down. Pipework installed without properly positioned isolation valves means draining the whole system — or whole floors of a building — to change a single component. Isolation valves are cheap. Draining a ten-storey system is not.
2. Air traps and poor falls
Pipework that rises and falls without air vents at high points will airlock. Systems that don't fall correctly to drain points can't be emptied properly. Both problems are designed in at installation stage and are painful to fix afterwards.
3. Supports that ignore expansion
LTHW pipework expands and contracts every time the system heats and cools. Rigidly fixing long runs with no expansion allowance — or using the wrong support type — transfers that movement into joints, valves and equipment connections. The leaks usually appear a year or two after handover, conveniently outside the defects period.
4. Concealing untested pipework
Ceilings get closed, walls get boarded, and then the leak appears. Pipework must be pressure tested before it's concealed, with the test witnessed and recorded. If your contractor is keen to get pipework covered up quickly, ask what the rush is.
5. No coordination with other services
Heating pipework routed without reference to ductwork, cable containment and structural steel ends up clashing — and clashes on site get 'resolved' by whoever is there first, usually with extra bends, offsets and fittings that restrict flow and look a mess. Early coordination costs nothing compared to site improvisation.
6. Treating commissioning as someone else's problem
The pipework installer doesn't usually commission the system, but the installation has to be ready for commissioning: clean, tested, vented, with valves set and accessible. Installations that ignore this leave the commissioning engineer — and the client — picking up the pieces.
Avoiding all of this
None of these mistakes are complicated to avoid. They need a contractor who plans the installation before starting, coordinates with the wider team, and tests properly before concealment. That's the standard we work to on every heating pipework project — if you'd like that approach on yours, get in touch.
Related services
Start a conversation
Need this done properly on your project?
Tell us what you're planning and we'll talk through the scope, the sequence and what it takes to do it right.